We are still without irrigation. We finally have freight tracking on one of the motors that we ordered in July. It is supposed to deliver 11/27. If it arrives as scheduled, the crane will be here on 11/28 to remove the pump house roof to install it (and a new pump turbine). We will let you know if we are able to locate replacement parts for the old well pumps before then. In the meantime, hand watering and hose/sprinkler watering is permitted by the County (Thanksgiving water fights for the kids, anyone?) Thank you for your patience.
This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.